Power Grid Corporation

Placement Experience :


Written Test :

On the lines of other PSU’s like NTPC  ,there was not written test conducted by Power Grid Corporation. The process followed was :
1) Shortlist
2) Interview
 
Shortlist:
It was based on CGPA

Interview:
             Direct interview was taken which consisted of both HR and Technical questions. There questions about summer project and training.

Many Technical questions from Power Electronics, Wireless Communication, and Optical Fibers were asked.
Profile Offered :
Graduate Engineer Trainee
Pay Scale : 
CTC- 11 LPA ( after 6th pay commission)
Eligibility Criteria :

                                 1.Shortlist based on high CGPA
General Advice :

                               1.Be strong in Elementary physics(10th grade). General concepts from Electrical topics are questioned.
Details about the Company :

POWERGRID, a Navratna Public Sector Enterprise, is one of the largest transmission utilities in the world. POWERGRID wheels about 45% of the total power generated in the country on its transmission network. POWERGRID has a pan India presence with around 71,500 Circuit Kms of Transmission network and120 nos. of EHVAC & HVDC sub-stations with a total transformation capacity of 79,500 MVA.POWERGRID has also diversified into Telecom business and established a telecom network of more than 20,000 Kms across the country. POWERGRID has consistently maintained the transmission system availability over 99% which is at par with the International Utilities.


Note: This data is collected from various students across the country.